Mon-Fri : 9.00 am - 11.00 pm

SITE PREPARATIONS

Site preparation involves the demolition or wrecking of buildings and other structures, clearing of building sites and sale of materials from demolished structures.Site preparation is the first task that lays before any Engineer to start new project in site that is unfriendly to the project. It a challenging activity that must be began with. In civil engineering projects, the site preparation can be soil clearing,

Site preparation also entails blasting, test drilling, landfill, levelling, earth-moving, excavating, land drainage and other land preparation

JOBSITE CLEARING

Concrete is a monolithic mixture of cement, aggregate, and water that can be poured flat or into raised forms on the jobsite.

FOUNDATION ESCAVATION

Excavation Procedure for Foundation. For small buildings, excavation is carried out manually.

BACKFILLING OF FOUNDATIONS

backfilling a basement foundation puts a momentary stress on the walls. Concrete takes weeks to get strong.

SEWER & WATER LINES

A "water line" usually refers to a pipe supplying pressurized water ready for use while a sewer line refers a pipe.

INSTALLATION OF PEA GRAVEL

pea gravel is typically 3/8”. It is often softer to the touch too thanks to its rounded and smooth sides.

GRAVEL DRIVEWAYS

This system has been especially designed for gravel surfaces.Our micro-perforated base retains the gravel.